GC Fuji I Glass Ionomer Luting Cement in Capsule, Box of 50

Brand Name

: GC Asia

SKU

: PMH202305919-202200023-N/A

Product Code

: PMH202305919

-+

Excellent adhesion offering a durable marginal seal Extended working time 15 micron film thickness Easy seating of restoration Fast snap set Excellent radiopacity Compatible with pulp and tissue, with reduced risk of post-operative sensitivity GC Fuji I CAPSULE, Box of 50 RADIOPAQUE GLASS IONOMER LUTING CEMENT For use only by a dental professional in the recommended indications. RECOMMENDED INDICATIONS 1. Cementation of metal-based inlays, onlays, crowns, bridges and posts. 2. Cementation of high strength (zirconia based) all ceramic crowns and bridges. CONTRAINDICATIONS 1. Pulp capping. 2. Avoid use of this product in patients with known glass ionomer cement allergies 1. TOOTH PREPARATION a) Prepare tooth in usual manner. For pulp capping, use calcium hydroxide. b) Clean the prepared teeth with pumice and water. c) Rinse thoroughly with water. Remove excess moisture by blotting with a cotton pellet or gently blowing with an oil-free air. DO NOT DESICCATE. Prepared surfaces should appear moist (glistening). 2. RESTORATION PREPARATION Make sure that the restoration is pretreated and handled according to the manufacturer’s instructions. 3. POWDER AND LIQUID DISPENSING a) The standard powder to liquid ratio is 1.8 g/1.0 g (1 level scoop of powder to 2 drops of liquid). b) For accurate dispensing of powder, lightly tap the bottle against the hand. Do not shake or invert. c) Hold the liquid bottle vertically and squeeze gently. d) Close bottles immediately after use. 4. MIXING Dispense powder and liquid onto the pad. Using the plastic spatula, add all the powder to the liquid. Mix rapidly for 20 seconds. Note: When mixing larger amounts, divide the powder into two equal parts. Mix the first portion with all of liquid for 5 seconds. Incorporate the remaining portion and mix the whole thoroughly for 15 seconds (total 20 seconds). 5. CEMENTATION a) Coat the internal surface of the restoration with sufficient cement and seat immediately. The working time is 2 minutes from start of mixing at 23°C (73°F). Higher temperatures shorten working time. b) Maintain moderate pressure. c) Start removing excess cement when the excess cement feels rubbery. d) Finishing can be started 4 minutes 30 seconds after seating the restoration.

Related Products